Production
- All aspects of production are procured through our highly skilled and experienced team.
- Committed estimation department
- Fabrication is streamlined through our production planner to ensure deadlines are achieved
- All steel shotblasted by kaltenbach sprint 1504 prior to fabrication– to client specification
- Sawn to length and Accurately drilled by 2x Kaltenbach Saw & Drill Lines
- Steel is fabricated in our 14 dedicated bays working 24 hours per day
- All fabrication carried out to NSSS 7th edition
- All welders are qualified and certified at 6 monthly intervals
- Dedicated inspectors at every stage
- 4 x RWCs overseeing all aspects of production
- Purpose built temperature and humidity controlled paint shop
- Logistics organised to FORS Silver Accreditation
- Full traceability through our FPC
- Relative Certification Supplied for each project including photographic evidence
- 12 overhead cranes covering 60,000 Sq Foot of factory floor space
- 10-ton maximum single lift capacity
- 25m maximum piece length
- 24/7 manned secure premises with CCTV throughout factory and storage areas
Notice: Undefined index: project in
/home3/steeltekco/public_html/wp-content/themes/Steeltek/page.php on line
29
Notice: Undefined index: youtube in
/home3/steeltekco/public_html/wp-content/themes/Steeltek/page.php on line
49